欧美一级a免费放视频,欧美一级a免费放视频_丰满年轻岳欲乱中文字幕电影_欧美成人性一区二区三区_av不卡网站,99久久精品产品给合免费视频,色综合黑人无码另类字幕,特级免费黄片,看黃色录像片,色色资源站无码AV网址,暖暖 免费 日本 在线播放,欧美com

合肥生活安徽新聞合肥交通合肥房產(chǎn)生活服務(wù)合肥教育合肥招聘合肥旅游文化藝術(shù)合肥美食合肥地圖合肥社保合肥醫(yī)院企業(yè)服務(wù)合肥法律

QBUS 6820代寫,、代做Python編程設(shè)計
QBUS 6820代寫、代做Python編程設(shè)計

時間:2025-05-22  來源:合肥網(wǎng)hfw.cc  作者:hfw.cc 我要糾錯



Prescriptive Analytics: From Data to Decision – QBUS 6820

Semester 1, 2025

Assignment 2

Issued: 2 May 2025

Submit date: Monday 19 May 2025 at 11:59pm

All problems to be submitted for assessment (20%)

Assignments must be typed. Handwritten assignments will not be accepted.

Submission of assignments is strictly through Canvas

For all the questions you are required to provide your Python Code (this can be done in

an appendix).

Question 1 (7 marks):

The owner of a commercial building has decided to renovate her facility. She has identified

the following activities that must be performed before she can reopen for business:

Activity Description Duration (in days) Predecessor activities

A New Plumbing 13

--

B Order/Rec Furniture 23

--

C Order/Rec Flooring 18

--

D Construct Partitions 8

--

E Paint & Wallpaper 8

A, D

F Install Furniture 6

E, B

G Install Flooring 7

E, C

H Move Inventory & Rec's 4

F, G

I Clean Old Shop 4

H

a. Draw the activity network for this problem (AON).

b. Provide the earliest and latest start and finish times, the slack for each activity, and identify

the critical activities (either on the network or in a table).

c. What is the duration of the project? Provide the critical paths(s).

d. Suppose that the owner has a binding contract stating that she must complete the

renovation within 32 days. The normal and crash times and costs for each activity are

summarized in the table below. Is it possible for her to complete the project within 20

days? If it is possible, at what cost? If it is not possible, what is the earliest time she can

complete the project and at what cost?

Activity

Normal Crash

Time (days) Cost (dollars) Time (days) Cost (dollars)

A 13

11,000 10 15,000

B 23

5,000 21 6,000

C 18

3,000 15 3,500

D 8

1,500 6 2,000

E 8

750 5 1,200

F 6

600 4 1,200

G 7

1,000 5 1,500

H 4

250 3 450

I 4 200 2 300

Question 2 (6 marks)

You are in charge of loading Cargo ships in Newcastle port. An agricultural commodities

dealer wants to transport the following products aboard a ship:

Commodity Amount available

(tons)

Volume per ton

(cubic feet)

Profits per ton ($)

1 48 4 7

2 30 2.5 5

3 15 3 6

4 18 4.5 8

You can select to load any and/or all of the available commodities. However, the ship has

three cargo holds with the following capacity restrictions:

Cargo hold Weigh capacity (tons) Volume capacity

(cubic feet)

Forward 32 180

Center 58 210

Rear 40 160

Only one type of commodity can be placed in any cargo hold (note that you can load the

same commodity in different cargos). However, because of balance considerations, the

weight in the forward cargo hold must be within 10% of the weight in the rear cargo hold

(this means that if the weight in the rear cargo is 10 tons, then that of the front cargo has

to be between 9 and 11 tons). In addition, the center cargo hold must be between 40% and

60% of the total weight on board.

Formulate an ILP model for the problem and solve it using Python.

Question 1 (7 marks):

A company needs to supply customers in 3 cities from its 3 warehouses.

The supplies,

demands and shipping costs (in dollars per unit) are shown below.

Destination

Warehouse 1 2 3 Supply

1 34 60 36 400

2 70 40 50 300

3 56 40 32 200

Demand 500 300 200

The company has identified the following goals:

Goal 1: The company would like to come as close as possible to satisfying its

customers demand. It would also like to come as close as possible to using the

warehouses supply.

Goal 2: It would like to ensure that the cost is approximately $60,000.

a. Formulate a goal programming model of this problem. Assume that your goal is to

minimize the sum of percentage deviations from your goals. You should assume that

warehouses hold 50 units of safety stock each (this means that they can use reserves

to increase their supply by 50 units. For example, Warehouse 1 would ideally supply

400 units, but can supply anywhere between 0 and 450 units).

b. Solve the problem using Python. Provide the Python code and clearly state your

solution.

c. How would your answer change if Goal 2 changes to $30,000? No need to

supply an addition Python code.

請加QQ:99515681  郵箱:[email protected]   WX:codinghelp

掃一掃在手機(jī)打開當(dāng)前頁
  • 上一篇:QBUS6600代寫,、Python/C++編程代做
  • 下一篇:COMP30023代做,、代寫C/C++編程語言
  • 無相關(guān)信息
    合肥生活資訊

    合肥圖文信息
    「多多評價助手」智能補(bǔ)單助手 | 出評軟件自動開團(tuán)工具
    「多多評價助手」智能補(bǔ)單助手 | 出評軟件自
    急尋熱仿真分析,?代做熱仿真服務(wù)+熱設(shè)計優(yōu)化
    急尋熱仿真分析,?代做熱仿真服務(wù)+熱設(shè)計優(yōu)化
    出評 開團(tuán)工具
    出評 開團(tuán)工具
    挖掘機(jī)濾芯提升發(fā)動機(jī)性能
    挖掘機(jī)濾芯提升發(fā)動機(jī)性能
    戴納斯帝壁掛爐全國售后服務(wù)電話24小時官網(wǎng)400(全國服務(wù)熱線)
    戴納斯帝壁掛爐全國售后服務(wù)電話24小時官網(wǎng)
    菲斯曼壁掛爐全國統(tǒng)一400售后維修服務(wù)電話24小時服務(wù)熱線
    菲斯曼壁掛爐全國統(tǒng)一400售后維修服務(wù)電話2
    美的熱水器售后服務(wù)技術(shù)咨詢電話全國24小時客服熱線
    美的熱水器售后服務(wù)技術(shù)咨詢電話全國24小時
    海信羅馬假日洗衣機(jī)亮相AWE  復(fù)古美學(xué)與現(xiàn)代科技完美結(jié)合
    海信羅馬假日洗衣機(jī)亮相AWE 復(fù)古美學(xué)與現(xiàn)代
  • 短信驗證碼 酒店vi設(shè)計 投資移民

    關(guān)于我們 | 打賞支持 | 廣告服務(wù) | 聯(lián)系我們 | 網(wǎng)站地圖 | 免責(zé)聲明 | 幫助中心 | 友情鏈接 |

    Copyright © 2025 hfw.cc Inc. All Rights Reserved. 合肥網(wǎng) 版權(quán)所有
    ICP備06013414號-3 公安備 42010502001045